Fresno Hoover High School Hybrid is a battery and solar power plant operated by Forefront Power, LLC with a total output of 1.40 MW.
Generators
| Source | Output | Count | Total output |
|---|---|---|---|
| solar | 2 |
External Identifiers
| ref:US:EIA | 63421 |
Fresno Hoover High School Hybrid is a battery and solar power plant operated by Forefront Power, LLC with a total output of 1.40 MW.
| Source | Output | Count | Total output |
|---|---|---|---|
| solar | 2 |
| ref:US:EIA | 63421 |